彩票软件app大全下载

Welcome to the website of Baotou Pangtian Electrical Equipment Co., Ltd.!

Product Categories

contact us

Baotou Pangtian Electrical Equipment Co., Ltd.

Service Hotline: 0472-6868842

Contact: 13722076608 (Manager Zhang)

18018652606 (Manager Wu)

Address: No. 18-19, Building 5, Northwest District, Haode, Donghe District

Website: zggz88.com


Tray type cable tray installation

Your current location : Home >> Products >> Tray type bridge

Tray type cable tray installation

  • 托盘式电缆桥架安装
  • Category: Tray type bridge

  • hit count:
  • Release Date: 2019/05/17
  • Online Inquiry
  • Detailed introduction

电缆桥架安装

Product selection points

1) Baotou cable trays , trunkings, and their hangers are used in corrosive environments, and should be made of corrosion-resistant rigid materials, or anti-corrosion treatment, anti-corrosion treatment 2) cable trays in the fire-resistant section In the cable ladder frame, the tray can be added with fire-resistant or flame-resistant plates, nets and other materials to form a closed or semi-enclosed structure, and the bridge and its hangers are painted with fire-resistant coatings and other measures. The overall fire resistance should meet the requirements of relevant national codes or standards.

2) It is not suitable to use aluminum alloy cable trays in places with high fire protection requirements.

3) The selection of cable ladder frame, tray width and height should meet the requirements of filling rate. In general, the filling rate of cable ladder frame and tray is 40% ~ 50% for power cables and 50% ~ 70 for control cables. %, And should reserve 10% -25% of the project development margin.

4) When selecting the load level of the cable bridge, the working uniform load of the cable bridge should not be greater than the rated uniform load of the selected cable bridge load level. If the actual span of the support and hanger of the cable bridge is not equal to 2m, then Work uniform load should meet the requirements.

5) The specifications and dimensions of various components and supports and hangers that meet the corresponding load conditions should match the straight sections of the pallets, ladder frames, and bent series.

6) When selecting the bent or lead-in and lead-out device of the cable tray, it should not be smaller than the minimum allowable bending radius of the cable in the cable tray.

7) For steel cable bridges with a span of more than 6m and aluminum alloy cable bridges with a span of more than 2m or a load requirement greater than the load class D, the strength, stiffness and stability shall be calculated or verified according to the engineering conditions.

8) When several sets of cable trays are laid in parallel at the same height, the maintenance and repair distance should be considered between adjacent cable trays.

URL of this article: http://zggz88.com/product/673.html

Keywords: cable tray installation , cable tray , cable tray construction

Recently Viewed:

    Welcome to leave us a message
    Please enter your message here and we will contact you as soon as possible.
    Name
    Contact person
    phone
    Landline / mobile number
    mailbox
    mailbox
    address
    address
    ?赌大小口诀 星鸿娱乐注册平台登录 姚记亚洲彩票软件app大全下载 蒙特卡罗官方赌场网址 龙成国际38元免费彩金 凯发电投网站 乐艺彩票下载平台 彩票pk注册网址 三分彩官网集团 大地彩票计划app